Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
Silvered cedar-shingle home beyond a broad green lawn, with white-trimmed windows, bluestone entry steps, an oak tree and clipped beech hedge.

East Hampton Village's New Plan Puts Its Downtown Ideas Behind Main Street

November 5, 2026

"At this point, shopping on Main Street isn't affordable. Mom and pop can't afford the rent there either. If we move a commercial district up towards the train station, that could be a more affordable place for year-round residents to shop."

Mayor Jerry Larsen made that point about East Hampton Village's future in remarks quoted by The East Hampton Star in March, during work on the village's first comprehensive plan update since 2002. The draft has since gone to the Village Board. Its most specific downtown proposals concern places most people pass through on the way to Main Street: the Schenck lot, the Reutershan lot, Barns Lane, and the lumber yard district near the train station.

A Plan Twenty-Four Years in the Making

BFJ Planning presented the draft to the Board of Trustees on October 16. The East Hampton Star reported that the plan was last updated in 2002. The current update started in 2024 with a public workshop. Popular goals there included more shopping and restaurants for year-round residents, less traffic congestion, and keeping or improving the village's look and feel. A virtual workshop followed in May 2025, and a third, standing-room-only workshop was held in March at the village's Emergency Services Building.

Those three goals help explain the draft's priorities. The ideas focus on downtown parking and on the industrial land near the train station, which could add the everyday retail people asked for. Noah Levine of BFJ described the document's reach to the board this way: "You can use this for the next 10 years and beyond, hopefully, to start to check off some of the things that are priorities for the community."

The draft on the village website is titled "August 2026 Draft for Board of Trustees." Its document page is dated September 16, 2026.

The Schenck Lot, Entered From Park Place

Today, the Schenck lot has two access points, and one of them is Barns Lane. The draft proposes a new access lane on the lot's west side. Levine described it as an extension of Park Place that would cross Newtown Lane and lead into the Reutershan lot. "It's just a concept," he told the board, "but something that could really help to manage circulation in that parking area."

With a new way in, Barns Lane could become "more like a pedestrian connection," with sidewalk seating and better walking links to the lot's spaces. The concept also covers better signage and getting as many spaces as possible out of the lot.

27east's coverage of the final workshop gave the earlier version in more physical detail. The village would buy the private road west of the current entrance, near Sant Ambroeus, and turn it into extra parking plus an entrance and exit. Levine said then that "the big block entrance on Newtown Lane would no longer be needed because you would enter in on Park Place, and so that could turn into a pedestrian corridor to create more of a grand entrance to the Schenck parking area."

Reutershan, Where Every Improvement Costs a Space

The Reutershan lot has a different problem. Levine told the board it is already "maximized for parking." It could be more pedestrian-friendly and better looking, with stronger connections to the shops that face it, "but there's a tradeoff with losing parking spots. That's just something to consider and perhaps something to address at a future point."

The suggestions for Reutershan include one-way traffic with angled parking, wider sidewalks in front of the businesses on the lot's north side, more landscaping, and a footpath across the lot to Herrick Park.

In March, BFJ also put the traffic lights at Cooper Lane and Newtown Lane on the table, proposing to remove them to ease bottlenecks, along with a redesign of the Cedar Street and North Main Street intersection.

Location What the draft suggests How BFJ framed it
Schenck lot New west-side access lane extending Park Place across Newtown Lane into Reutershan; better signage; more spaces "Just a concept"
Barns Lane Pedestrian connection with sidewalk seating Depends on the new Schenck access
Reutershan lot One-way flow, angled parking, wider north-side sidewalks, landscaping, path to Herrick Park A tradeoff against parking spaces, "perhaps" for a future point
Cooper Lane and Newtown Lane Traffic lights removed Presented at the March workshop
Cedar Street and North Main Street Intersection redesign Presented at the March workshop

The Gingerbread District, Already Flagged in 2002

The idea in Larsen's March remarks covers a specific area. The Gingerbread district runs along Gingerbread Lane, King Street, Race Lane, and Railroad Avenue, near the train station. It is zoned for manufacturing, and its current uses include an auto parts and lighting store, a PSEG storage facility, and Riverhead Building Supply's lumber yard. The 2002 comprehensive plan had already recommended a commercial district study for the area.

"The Gingerbread area is underutilized and its current zoning as manufacturing may no longer be appropriate," BFJ senior planner Emily Tolbert said at the March workshop, as reported by 27east. She said the development a master plan would aim for is locally serving retail, mixed-use buildings, and more efficient parking.

The October draft keeps the master plan as the next step. Levine called the area "the remaining opportunity for development" and said a master plan should "really think specifically about what should be there," with priority on retail that serves local needs. Its timing depends on wastewater. "That would definitely be tied into anything that happens with a sewer district," he said. "So that would require some future planning." In March, BFJ described two ways to handle the area's septic limits. The village could build a sewer system, or it could transfer development rights from less-dense uses to lots that need more septic flow, such as homes or "wet-use" retail like restaurants.

This connects back to Main Street. The 2024 workshop asked for more shopping and dining for year-round residents. The mayor pointed to Main Street rents as the obstacle. The draft responds by pointing that retail toward a district near the train station that is still zoned for lumber and storage.

The Rest of the Draft Follows the Same Pattern

The other chapters cover housing and neighborhoods, historic preservation, community and cultural assets, parks and natural resources, sustainability and resilience, and future land use. Levine said there were not many strong housing recommendations, because "people felt that the zoning is working pretty well, but there might be some tweaks to think about, particularly in the smaller lots in the village." The tweaks include tighter limits on house size on smaller lots, enforcement of tree preservation, clustered subdivisions, upper-floor apartments in the village center, a housing working group, and a long-term plan for a possible sewer district.

The commercial chapter recommends updating the zoning use tables, considering a business improvement district, and addressing private club and hotel uses, which Levine called "a major concern." The plan also notes that cellphone service is spotty downtown. It recommends a natural resource inventory, monitoring the village's street tree canopy, and enrolling in New York's Climate Smart Communities program.

All of these items go into an implementation matrix that rates each one's difficulty from 1 to 4. A 1 is a simple administrative action, and a 4 requires extensive coordination and cost. "It doesn't mean these aren't priorities," Levine said of the harder items. "It just means it requires more work." Among the ideas covered here, the Gingerbread master plan and the sewer district it depends on are the ideas BFJ itself tied to future planning.

From Draft to Adopted

The draft has been reviewed by the Suffolk County Planning Commission, and the village planning board has recommended approval, according to village planner Billy Hajek. Levine laid out the rest of the process:

  1. The Board of Trustees reviews the draft. Mayor Larsen said that if members agree, the board will schedule a public hearing on adoption.
  2. The board holds a public hearing, and the plan is revised further.
  3. The plan goes through review under the State Environmental Quality Review Act. A negative declaration, meaning a finding of no detrimental environmental impact, clears the way for adoption.

The board's next listed meetings are November 20 at 11 a.m. at 1 Cedar Street, followed by December 18, according to the village's Board of Trustees meeting calendar. The full draft and its appendices are posted on the village website for anyone who wants to read the Schenck and Reutershan sections before a hearing.

For the holidays, the same blocks will be busy in their current layout. The East Hampton Village Foundation's SantaFest includes a holiday window contest for businesses on Main Street, Newtown Lane, and Park Place from November 27 through December 5. On December 5, Santa arrives by helicopter at Herrick Park, 67 Newtown Lane, at 11 a.m., and the parade steps off at noon on Main Street and Newtown Lane. The tree and menorah lighting follows at 5 p.m. at Herrick Park, the same park the draft's proposed Reutershan footpath would lead to.

If you own on Newtown Lane, Park Place, or near the Gingerbread district and want to talk through how the draft plan might come up when you price or market a property, David Tenenbaum is following each step from the board's review through the hearing and can walk you through it in person. Schedule a Showing, or just a conversation, whenever it suits you.

Follow Us On Instagram